Fence cost per metre in Spain: what a linear-metre rate covers

Fences are usually priced per linear metre, but the rate only makes sense once you know which work sits inside it. Here is how we build up a per-metre figure, and what tends to be priced separately.

Fence cost per metre is the price of one linear metre of finished fence measured along the boundary line, normally covering posts or pillars, panels or mesh and their foundations, while items such as old fence removal, clearing, end posts, corners and waste are often priced as separate lines.

What does 'per linear metre' actually measure?

In short: a linear metre is one metre of fence measured along the ground line, regardless of height or slope.

In Spain fences are almost always measured in metros lineales: the length of the run along the boundary, from one end to the other. It is a length, not an area, so a tall fence and a low fence of the same length have the same number of linear metres. Height, panel type and foundations are what make each of those metres more or less work.

On a sloping plot the measurement follows the line on the ground, and a fence with several corners or changes of direction is measured section by section. That is why we always measure the run ourselves before the final quote, even when you have sent us an approximate length. Our page on what a fence quote includes shows where the linear-metre lines sit in the document.

Long run of green 3D mesh fencing with a concrete base along a dirt track
Long run of green 3D mesh fencing with a concrete base along a dirt track

Which work is usually inside a per-metre rate?

In short: typically the repeating parts of the fence – posts, panels or mesh, fixings and their foundations – and not the one-off items.

A per-metre rate works well for anything that repeats evenly along the run. For a mesh fence that means intermediate posts, panels, clips and the footing for each post. For a slatted fence on a low wall it can mean the wall itself, the pillars at regular spacing and the slat panels between them.

One-off items do not fit a per-metre logic and are usually separate lines: end and corner posts, steps on a slope, connections to an existing wall, removal of an old fence, clearing of the fence line, waste handling and any licence. When a quote shows a single per-metre rate and nothing else, ask which of those items are inside it. The line items explained guide goes through each one.

Why do per-metre rates differ so much between quotes?

In short: because each contractor puts different work inside the same unit, and because the plots themselves differ.

Two per-metre figures can only be compared if they describe the same thing. One contractor may include foundations and finishing in the metre, another may price them separately and show a lower headline rate. A third may assume easy access and flat ground, then add extras once work starts.

The plot also matters. Rock, loose fill, a steep slope or access only on foot change the effort per metre even for identical materials. That is why we explain each of these effects on the fence cost factors page rather than quoting a rate in the abstract. For a structured way to line up several quotes, use our guide to comparing quotes.

Does a longer fence cost less per metre?

In short: often the per-metre share of fixed costs falls on a longer run, but it depends on what changes along the line.

Some work is the same whether the fence is short or long: travelling to site, setting up, setting out the line, and handling the start and end of the run. On a short fence these fixed items weigh heavily on each metre; on a long one they are spread thinner.

The opposite can also happen. A long run on an inland finca may cross rock, gullies and scrub that a short garden fence never meets. So length alone does not decide the rate. What we can say is that combining several sections into one job, rather than ordering them separately, usually lets the fixed items be shared. Our blog post on lowering fence cost without cutting quality explores that idea further.

How do you get a per-metre figure for your own fence?

In short: send photos and an approximate length, and we price the repeating work per metre and the one-off items separately.

We need to see the line, the ground and the access, and to know what you want: type, height, with or without a low wall. With that, we can split your fence into per-metre lines for the repeating work and unit lines for everything else. The result is a quote where the per-metre rate is honest because it is not hiding anything.

If you are abroad, the quote from photos page explains which photos help most. For an overview of how the type of fence affects the rate, see cost by fence type.

BR
Bauman Raymond Attila
Author and person responsible · Last reviewed:
How we build it – step by step

How we build it – step by step

  1. Approximate length

    You give us a rough length from a tape, a measuring wheel or an online map, together with photos of the line.

  2. Site measurement

    We measure the run ourselves in linear metres, section by section, noting corners, ends and changes of direction.

  3. Ground and access check

    We record slope, rock, loose fill, obstacles and how materials will reach the line, since these change the work per metre.

  4. Split repeating and one-off work

    Posts, panels and their footings go into per-metre lines; ends, corners, steps, removal, clearing and waste get their own lines.

  5. Itemised quote

    We send the presupuesto por partidas with quantities and prices for each line, without commitment.

  6. Build as quoted

    Once accepted, we set out, dig, pour, fix posts and mount panels along the measured run; any change you ask for is priced and agreed before it is made.

When is it the right choice – and when not?

When is it the right choice – and when not?

A good fit if…

  • Comparing quotes for the same fence type and height
  • Long runs where the repeating work dominates
  • Budget planning once the scope is fixed
  • Owners who want to see how length changes the total

Consider another option if…

  • Comparing different fence types against each other
  • Short runs where ends and corners dominate
  • Plots with heavy rock, steep slopes or difficult access
  • Any quote that shows a rate without listing what it includes
What affects the cost?

What affects the cost?

We don't publish fixed prices: every fence is quoted line by line using these factors.

  • Total linear metres and number of separate sections
  • Height of the fence
  • Panel, mesh or slat type
  • Low wall or posts only
  • Foundation type and size
  • Ground: rock, loose fill, roots
  • Slope and number of steps
  • Access for materials and machinery
  • Ends, corners and connections to existing walls
  • Removal of an old fence and clearing of the line

Fence cost calculator

Itemised quoteItemisedquoteLinear metresHeightPanel typeLow wall or notFoundationsGround & slopeAccessOld fence removalClearingPermit
Our specialist sites by fence type
FAQ

Frequently asked questions

What is the average fence cost per metre in Spain?

We do not publish averages because they hide too much. A figure that suits a flat garden would be misleading for a rocky hillside or a run with a low wall. We price your fence from photos, length and the ground conditions.

Is the per-metre rate the same for every height?

No. A taller fence needs stronger posts and larger foundations, and often different panels. The rate is calculated for the height you choose.

Does the per-metre rate include the low wall?

It can, if the wall runs evenly along the whole line. Some quotes price the wall as a separate per-metre line, which makes comparison easier. Ask which approach a quote uses.

Are corners and gate openings included in the metre?

Usually not. Corners, ends and openings need special posts or pillars, so they are normally priced as separate units. Gates themselves are not part of our offer.

How is a sloping fence measured?

Along the line on the ground. Steps or sloping panels are then priced according to how the fence follows the terrain.

Can I measure the length myself?

Yes, for a first assessment an approximate figure is enough. We always measure on site before the final quote so that the price matches the real run.

Why is my quote higher than a rate I saw online?

Online rates usually assume ideal conditions and leave out foundations, removal, clearing, waste or IVA. An itemised quote shows all of these, so it is easier to see what an online figure omits.

Is IVA included in the per-metre rate?

In our quotes IVA is shown separately so you see both the base and the total. Always check whether a rate you are given includes IVA or not.

Does a longer fence always cost less per metre?

Not always. Fixed costs are spread over more metres, but a long run can also meet more rock, slope and scrub. The quote reflects the actual line.

Can you price only part of my boundary?

Yes. We can quote sections separately or together, and the quote will show which lines belong to which section.

What happens if the final length differs from the estimate?

We measure before the final quote, so differences should be small. If the scope changes during the job, the change is priced against the existing lines and agreed with you first.